+86-512-66573123
  • Product Name
  • Product Keyword
  • Product Model
  • Product Summary
  • Product Description
  • Multi Field Search
You are here: Home » Application » Civil Engineering

Application

Dynatronic testing and analysis products are widely used in different industries, automotive, transportation, medical and so on, especially in Aerospace, we have developed several typical project cases, please look at related and some specific applications below.

Civil Engineering

  • Monitoring for pigging process of oil West-East gas pipelines

    Project name: Monitoring for pigging process of oil West-East gas pipelines Brief introduction:Our company is invited by the China Petroleum Pipe Institute to participate in the monitoring of the pigging process of the West-East Gas Pipeline, mainly to monitor the changes about the pipeline pressure

  • Guizhou Qianzhong Reservoir Gate Experimental Report

    Project name: Guizhou Qianzhong Reservoir Gate Experimental Report Brief introduction:By testing the time-averaged pressure and the pulsating pressure characteristic parameters of the arc working gate, the time-averaged pressure and pulsating pressure data of the radial gate under different operatin

  • Project name: Shanghai Yangtze River Bridge Modal Force Test

    Project name: Shanghai Yangtze River Bridge Modal Force TestBrief introduction:Before the Shanghai Yangtze River Bridge was put into use in 2011, Tongji University used DE5907A to perform modal experiments for the full bridge (including the bridge tower), and confirmed that the frequency, vibration

  • Shanghai Lupu Bridge Static Load Experiment

    Project name: Shanghai Lupu Bridge Static Load ExperimentBrief introduction:Shanghai Lupu Bridge is the world's first steel structure arch bridge. After the completion of the bridge, SE-860 was used to evaluate its performance about the bridge static load.

  • Qingdao Cross-Sea Bridge Test

    Project name: Qingdao Cross-Sea Bridge Test Brief introduction:Our company cooperated with related inspection departments to complete the dynamic and static test of Qingdao Cross-sea Bridge, sports car experiments and modal experiments, etc. Due to the long test time period and the large amount of t

  • Three Gorges Cofferdam Blasting Test

    Project name: Three Gorges Cofferdam Blasting TestBrief introduction:After the major project of the Three Gorges Dam was completed in 2006, the upstream cofferdam was required to be demolition. The cofferdam will burst into the water after the cofferdam is blown, it will have a certain impact on the

© 2017-2018  Dynatronic Corporation Ltd.  All rights reserved.   
Site Map     Designed by iwonder.cn

Contact

Tel: +86-512-66573123
Fax: +86-512-66573122
Email: sales@dynatronic-tech.com

Follow Us

Facebook  Linkedin   Youtube   VK

Leave a message